Loayes Contractor requires a 30% deposit at the beginning of a project and the balance as soon as the project is done. All payment dates will be detailed in the contract.
Loayes Contractor requires a 30% deposit at the beginning of a project and the balance as soon as the project is done. All payment dates will be detailed in the contract.